Ideally,preventive maintenance will be performed just prior to a breakdown or failure.

A) True
B) False

Correct Answer

verifed

verified

Breakdown maintenance takes the form of scheduled periodic maintenance.

A) True
B) False

Correct Answer

verifed

verified

The degree of technology involved is a factor affecting the decision of how much preventive maintenance is desirable.

A) True
B) False

Correct Answer

verifed

verified

Breakdown maintenance is _________ preventative maintenance is _____.


A) reactive; proactive
B) proactive; reactive
C) expensive; inexpensive
D) inexpensive; expensive
E) none of the choices are correct.

F) C) and E)
G) B) and C)

Correct Answer

verifed

verified

A

Preventive maintenance is generally scheduled on the basis of: I.historical records. II.predetermined number of operating hours. III.planned inspections.


A) I only
B) II only
C) III only
D) II and III only
E) I, II, and III

F) A) and B)
G) A) and C)

Correct Answer

verifed

verified

E

Reliability-centered maintenance is based on historical data and ongoing monitoring of equipment condition.

A) True
B) False

Correct Answer

verifed

verified

The goal of maintenance is to maintain the productive system in good working order while minimizing:


A) total preventive maintenance costs.
B) total breakdown maintenance costs.
C) total maintenance costs.
D) the difference between preventive and breakdown costs.
E) the ratio of breakdown to preventive maintenance costs.

F) A) and D)
G) A) and E)

Correct Answer

verifed

verified

Breakdown maintenance includes activities such as equipment inspection and adjustment.

A) True
B) False

Correct Answer

verifed

verified

The cost of replacement is not considered as part of maintenance analysis.

A) True
B) False

Correct Answer

verifed

verified

Predictive maintenance is a major part of reliability-centered maintenance.

A) True
B) False

Correct Answer

verifed

verified

The frequency of breakdown of a piece of equipment per month is shown in the table.The cost of a breakdown is $1,000 and the cost of preventive maintenance is $2,000 per month.Assume that the equipment breakdown can be avoided if preventive maintenance is performed.Should the manager use preventive maintenance,or would it be better to fix the equipment when it breaks down? The frequency of breakdown of a piece of equipment per month is shown in the table.The cost of a breakdown is $1,000 and the cost of preventive maintenance is $2,000 per month.Assume that the equipment breakdown can be avoided if preventive maintenance is performed.Should the manager use preventive maintenance,or would it be better to fix the equipment when it breaks down?

Correct Answer

verifed

verified

The expected number of breakdowns withou...

View Answer

Planned periodic inspections is one method of determining when preventive maintenance activities should be performed.

A) True
B) False

Correct Answer

verifed

verified

One basis for scheduling preventive maintenance is the passage of time.

A) True
B) False

Correct Answer

verifed

verified

The goal of maintenance is to maintain the productive system in good working order at minimum costs.

A) True
B) False

Correct Answer

verifed

verified

The average time before breakdown of a machine is normally distributed and has a mean of 7 weeks and a standard deviation of 1.5 weeks.If breakdown cost averages $2,500 and preventive maintenance costs $500,what is the optimal preventive maintenance interval?

Correct Answer

verifed

verified

The ratio of preventive cost to the sum ...

View Answer

Maintenance activities are often organized into the two groups: buildings and grounds,and equipment maintenance.

A) True
B) False

Correct Answer

verifed

verified

When breakdowns become frequent and/or costly,managers are faced with a trade-off decision between the cost of continued maintenance and the cost of ________________.


A) passage of time
B) preventive maintenance
C) breakdowns
D) replacement
E) reliability

F) A) and E)
G) A) and D)

Correct Answer

verifed

verified

D

Cost of equipment breakdown can include: I.loss of output. II.cost of idle workers. III.damage to other equipment.


A) I only
B) II only
C) III only
D) I and III only
E) I, II, and III

F) A) and B)
G) B) and E)

Correct Answer

verifed

verified

"Total productive maintenance" is best described as:


A) avoiding all breakdown maintenance.
B) doing a great deal of preventative maintenance to try to avoid breakdown maintenance.
C) having workers that operate equipment responsible for performing maintenance.
D) extending preventative maintenance back to design.
E) none of the choices are correct.

F) A) and B)
G) A) and D)

Correct Answer

verifed

verified

The type of maintenance which is reactive in nature is:


A) breakdown maintenance.
B) predictive maintenance.
C) preventive maintenance.
D) total productive maintenance.
E) reliability-centered maintenance.

F) None of the above
G) A) and D)